Showing posts with label upgrades. Show all posts
Showing posts with label upgrades. Show all posts
Wednesday, 26 April 2017
Mirror dinghy CNC files upgrades
We are on file update six, this saves plywood but adds more features, such as the rudder and dagger board foil, hidden side bulkheads, backer rings to the four round plastic inspection hatches, plus part #44!

Cut from both 4mm and 6mm okoume marine plywood, this kit will make you the lightest Mirror possible?

How easy was this? we started mid March, such work took time and required the first kit which is in the picture to be assembled and from that we further developed our CNC cut files.
Shipping locally or world wide should not be a problem.
Roy
Cut from both 4mm and 6mm okoume marine plywood, this kit will make you the lightest Mirror possible?

The decks are just loose laid in place in this picture, check how well they fit.
How easy was this? we started mid March, such work took time and required the first kit which is in the picture to be assembled and from that we further developed our CNC cut files.
Shipping locally or world wide should not be a problem.
Roy
Thursday, 2 March 2017
More HBYC marina upgrades
The process of maintainance on the HBYC marina is an ongoing event, as mentioned most works are sub sea so not readily visible, not so with the new walkway bridge and landing.

Brand new planks were installed yesterday, ready for the summer season and the arrival of the world cruising yachts.

Out with the old and in with the new.

Brand new planks were installed yesterday, ready for the summer season and the arrival of the world cruising yachts.
Out with the old and in with the new.
The clubs launch is a real workhorse, used for placing bouys and by the divers when doing the annual chain maintainance.
Roy
Subscribe to:
Posts (Atom)